Quote Originally Posted by ellobogrande View Post
Perhaps I should have said "the next action might change". ....So, after my father-in-law gave me the name of an electrician that he had worked with at his job, my next action changed from "Cut hole in ceiling and probe for wiring path" to "Call that electrician to schedule job estimate".
That makes sense. A lot of mine are things like Red Barn Fix Inside Door latches and my next action is Change the location of the east chicken door latch to be inside from the middle segment. The thinking went in a long time ago about how we actually use the barn and where you need to be to open the latches so just because I'm not doing it for a while I don't want to lose that. When I do make it active that location won't change.

Same thing for most of our multi year projects. The next action on most of them are things like Call X to get on his schedule for the short fence from Y to Z with 3 gates. For that one the project support includes a drawing of where the gates will go and their sizes.

I've already done so much thinking on most of those projects that the actions don't change.

For the others I almost never have a next action at all. I have someday maybe projects that are Deal with winter sheep water. Nothing more as I've not even thought about all the problems nor figured out a good solution but I wanted to save it as a possible thing to fix someday.