Thread: GTD Lite

  1. #1

    Default GTD Lite

    Life is an open loop.

    I wonder if there are others out there who are content with a partial impelementation of GTD. There is no way my lopsided right brain could ever implement the full blown GTD methodology. There are just too many pieces. It feels like life under a microscope

    Am I the only one? I keep lists of projects and NA's, but the weekly review, the filing system, the areas of focus, etc. Are you kidding me?

  2. #2
    Join Date
    Feb 2005
    Posts
    1,479

    Default

    IMO, if you skip the weekly review, you are missing the most important component. Among other things, the weekly review is essential for making sure your system really is trustworthy. Without that, nothing else works.

    Katherine

  3. #3
    Join Date
    May 2003
    Posts
    215

    Default

    Life is fulfillment completed one next action at a time.

    Being left brained is only a limitation to implementing GTD if you believe it is. Your implementation may look a lot different than mine on the surface, but the same principles apply.

    GTD gives you a wide angle and zoom lense on your life. You can look at the big picture or zoom in on the smallest details.

    Mimimalist GTD:

    1. Next Action list by context.
    2. Someday Maybe list.
    3. Projects list with Project Planning & Support Materials
    4. Inbaskets/Collection Buckets
    5. General Reference Filing System
    6. Weekly Review.

    Without any one of these six things you really (IMHO) doing GTD.

    This of course doesn't get you to the higher perspectives, but once you master the above 6 the higher 30,000+ foot levels are pretty easy.

  4. #4
    Join Date
    Dec 2003
    Posts
    165

    Default

    i'm able to do the minimal stuff above, but I still haven't been able to get to the complex brainstorming and organizing activity you're supposed to do for any sizable project. Not sure how people deal with that - I've posted before about it but it's something I'm not getting.

  5. #5
    Join Date
    Feb 2005
    Posts
    1,479

    Default

    Quote Originally Posted by furashgf
    i'm able to do the minimal stuff above, but I still haven't been able to get to the complex brainstorming and organizing activity you're supposed to do for any sizable project. Not sure how people deal with that - I've posted before about it but it's something I'm not getting.
    Can you give an example project and explain how you would approach it? It's possible that your projects simply aren't big enough to require much thought. It's also possible that you're already using a GTD-friendly methodology, but just don't recognize it as such. If you're happy with the approach you're using, don't worry about it. If not, maybe you could tell us why not?

    Katherine

  6. #6
    Join Date
    Dec 2003
    Posts
    165

    Wink

    Well, here's a good example. The project is "Rewrite Document Generation System." So, we've got a project plan and a bunch of documents that evolve over time. It's a decent size project, I have to coordinate, organize, etc. the work of programmers, staff, communicate w/ users, etc.

    So, I've got a project plan - which is a bunch of tasks, mostly focused on the programming orented things.

    However, there's tons of "stuff" that goes with this project. Hundreds of nudges, etc. I could be doing.

    So, what I think I'm supposed to do is do a full-on brainstorm/organization of the project. I've got a trigger list (see attached) and an outlining tool I like to use. So what I should do is take all the materials and notes I have, and work through my trigger list and brainstorm a super-detailed plan, then organize it as he describes. Then, on the weekly review, I'm just "picking the next task" from this super organized hierarchical plan.

    Instead, what I have is a list of stakeholders and what they want, and during the weekly review I just come up with next actions. I don't have any trouble coming up with them, but (1) just looking at the name of the task and coming up with next actions isn't the same as pulling a task off an organized list and (2) I'm guessing the reason the GTD book suggests doing this is it helps identify ALL the stuff you/someone could be doing, not just what pops into your head. I'm sure that if I were able do do this process like all the other GTD people are, I'd find all sorts of tasks I could do that would make the project even better. I can start on the brainstorming thing, but about 10 minutes into it I end up not finishing it. Multiply this times 30 similarly complex projects, and there you go. I've stopped trying to brainstorm/organize during the weekly review, because I never finished a weekly review when I did that. When I make "Brainstorm/organize project X" a NA @Anywhere, that doesn't work either since I skip it because the combination of energy/time. i.e., nearly any other task on my list looks intuitively like a task that I could handle as opposed to that task. I don't think its tools, because the tool I use to outline/brainstorm is a tool I use all the time for other activities and I enjoy it. It's not that I don't know how to brainstorm, since that's how I get the team to come up with task lists, etc.
    Last edited by furashgf; 05-23-2006 at 11:27 AM.

  7. #7

    Default

    Regarding a partial implementation of the system:

    Getting Things Done is kind of like a car. You can buy an engine, and that's nice. You can buy a frame, and that's nice. You can buy a gas tank, and that's nice. But they can't fulfill their full purposes unless they're all put together and integrated.

    There are some optional niceties like air conditioning in a car or the Outlook Add-In in GTD. But there is a certain fundamental set of practices, without which the system works at only at a small fraction of its true potential.

  8. #8

    Default

    Hmmmm. I think you may have gotten the wrong idea about GTD.

    GTD does not require a super-detailed plan for each project. Far from it.

    All you need written down are a goal, and the next physical visible action. You can plan if you want to.

    Sounds like the overall project can be divided into a number of distinct projects. What if you identified the specific goal for each part of the overall Document Generation System Project, then worked out just the next thing that needs to be done?

    The "higher-level" planning in GTD is more about identifying what you want to do and how your projects fit into your larger goals (e.g., "writing a short story" as part of "becoming a writer"), as I understand it.

    Does that help?

  9. #9
    Join Date
    Feb 2005
    Posts
    1,479

    Default

    Your approach sounds fine to me. If the project is moving forward and all the stakeholders are happy, don't worry about it.

    Why do you think you need a more detailed plan? "Because the book says so?" Or do you feel like the project is out of control in some way and being more organized would help?

    My understanding of GTD is that DA advocates doing exactly the amount of planning you need to do to feel like the project is under control, but no more. He absolutely does *not* suggest that you should plan out every single NA for a six month project in advance. Quite the opposite, in fact.

    Katherine

  10. #10
    Join Date
    Dec 2003
    Posts
    165

    Default

    That makes sense. The reason I think I need to is because most GTD people posting talk about, during the weekly review, getting the NA from your organized plan. I'm NOT doing that. I'm looking at the name of the project, maybe glancing at the stakeholders/vision, and then coming up with 1-5 or so next actions to do.

    Now that you describe it, a super-detailed plan would probably not survive encounter with reality and you'd end up spending all your time updating your super-detailed plan. That happens with big "P" project plans all of the time. It's called the "glass case" plan, where the project manager either spends all his/her time updating a plan to make it match to today's reality, or everybody gives up on the plan because it's out of date (it's in a "glass case").

+ Reply to Thread

Similar Threads

  1. Project planning Lite
    By Dave John in forum PUBLIC: Discuss Getting Things Done
    Replies: 3
    Last Post: 03-19-2010, 07:02 AM
  2. GTD Lite
    By LifeButBetter in forum PUBLIC: Discuss Getting Things Done
    Replies: 17
    Last Post: 02-07-2010, 09:47 AM
  3. GTD Lite
    By Anonymous in forum PUBLIC: Discuss Getting Things Done
    Replies: 19
    Last Post: 03-16-2005, 10:12 PM